Turbine Commissioning
Safety & Performance
At AS Power Engenharia, we carry out the commissioning of industrial and aero-derivative turbines following OEM standards and international norms, ensuring that each subsystem – mechanical, electrical and control – is validated, calibrated and ready for safe and optimized operation.
Scope of Services
-
Pre-start tests – inspection of lubrication, fuel, intake and exhaust air, cooling and fire protection systems.
-
Checking Interlocks and Safety Systems – checking permissives, alarms and automatic shutdowns according to OEM specifications.
- Calibration and Final Adjustments – setting up instruments, valves, sensors and control parameters for stable operation.
- Functional Load Tests – evaluation of vibration, temperature, pressure, fuel consumption and dynamic response under different load regimes.
- Data recording and analysis – preparation of technical reports with photographic evidence, trend graphs and post-commissioning recommendations.
Industrial Turbines and Aeroderivatives
TM2500+ Gen8
GE Frame 6B
Pratt & Whitney FT8
GE LM6000
Advantages for your operation
Safe start
Reduction of operational risks from the first turn.
Optimized Performance
Fine-tuning to achieve maximum efficiency right from the start.
Technical Compliance
Ensuring that all manufacturer and standard requirements are met.
Complete Traceability
Documentation of each test and adjustment for operational history.
Lower risk of initial downtime
Mitigation of common faults in initial operation.
Request a technical proposal from AS Power Engineering and ensure the best performance from your turbine.